Has your Aire pegboard just arrived? Here are the official step-by-step assembly instructions. To choose the drilling and dowels according to your wall type (plasterboard, concrete, brick), consult the complete fixing guide.
1. Prepare the screws
🔧 Lightly screw the 4 screws (or more) into the special holes of the Pegboard with the provided Torx10 key. Leave 5 mm protruding.

2. Position the Pegboard
🧱 Place it on the wall in the desired location.
📐 Use a spirit level to align it horizontally or vertically.

3. Mark the wall
🔨 Hold the Pegboard in place and lightly tap on the screw heads to mark the drilling points.

4. Drill the holes
🛠️ Remove the Pegboard.
Drill the marks with a 6 mm drill bit.

5. Insert the dowels
👊 Drive the provided Fischer Duopower dowels into the holes with a hammer.

6. Position the spacers around the screws
🧲 Place the calibrated spacers (without adhesive) around the Pegboard screws. These pieces ensure the correct distance between the wall and the panel.

7. Stick the adhesive spacers
🧲 Stick the adhesive spacers to the back of the pegboard, well distributed over the entire surface, and without obstructing the holes. These pieces ensure the correct distance between the wall and the panel.

8. Fix the Pegboard
🔩 Align the Pegboard with the dowels and screw until the corners are flush against the wall. Use the provided key to finish tightening.
💡 No need to overtighten: it's securely held.

Well done! Your pegboard is installed and ready to use!

0 comments